Benefits of choosing Goma’s Hydro Test Pump
|
Model Series
|
Max Power (HP)
|
Max Pump Speed (RPM)
|
Max Flow Rate (LPM)
|
Max Pressure (kg/cm2)
|
|
T-500
|
10
|
750
|
24
|
575
|
|
T-1400
|
20
|
750
|
81
|
1150
|
|
T-2000
|
25
|
800
|
162
|
300
|
|
T-2500
|
40
|
720
|
130
|
1400
|
|
TG-4000
|
60
|
435
|
145
|
1400
|
|
T/TG-8000
|
125
|
500
|
279
|
1400
|
|
T-12000
|
120
|
500
|
338
|
950
|
|
TG-15000
|
180
|
350
|
281
|
1400
|
|
T-20000
|
180
|
450
|
623
|
1400
|
|
T-40000
|
250
|
400
|
1318
|
1400
|
|
T-60000
|
300
|
350
|
1745
|
1200
|
Notes:
Application
Accessories
Yes, hydro test pump packages are engineered for reliable operation in remote, offshore, and harsh industrial environments. They are diesel engine-driven, ensuring dependable performance even where power is unavailable. Available in skid, trailer, or trolley-mounted configurations, they offer easy mobility and deployment. With rugged, heavy-duty construction, these systems deliver long service life and consistent high-pressure performance.
Available accessories include suction and discharge hoses, pressure regulating valves, isolation valves, non-return valves (NRV), pressure safety valves, pressure switches, chart recorders, and digital stroke counters. These accessories help create a complete and safe hydro testing solution.
Yes, hydro test pumps come in multiple power frame sizes with different plunger sizes to match specific pressure and flow requirements. Options such as RPM selection, operation selection, and integration of PRV (pressure regulating valve) ensure the right configuration for each testing application.
Hydro test pump packages are engineered with complete piping, hoses, and testing accessories, ensuring a plug-and-play design for quick setup. Their design focuses on simple operation and reliable performance even in demanding field conditions.
Hydro test pumps are used across oil & gas, fabrication, manufacturing, chemical, power, and pipeline sectors for rigorous pressure testing. They help verify the integrity of cross-country pipelines, pressure vessels, boilers, valves, and other critical equipment before commissioning.